Slide 24 of 36
Notes:
When the office exercise associated with Step 1 is complete, the practitioner should have an initial retrofit inventory map with potential sites located to be verified in the field. In this particular example, three types of retrofits have been identified: stream rehabilitation sites (perhaps identified from aerial photos), existing stormwater management facilities (yellow circles), and storm drain outfalls (red circles).