Slide 59 of 87
Notes:
This sedimentation basin was constructed to treat the erosion from the construction in the background. However, the basin is not being used in conjunction with other control measures and as a result is being quickly filled due to the heavy sedimentation. Without proper maintenance, this practice will fail.