Example
Checklist for Preliminary/Concept
Stormwater
Management Plan Preparation and Review
- Applicant information
- Name, legal address,
and telephone number
- Common address and legal
description of site
- Vicinity map
- Existing and proposed
mapping and plans (recommended scale of 1" = 50'.) which illustrate at a minimum:
- Existing and proposed
topography (minimum of 2-foot contours recommended)
- Perennial and intermittent
streams
- Mapping of predominant
soils from USDA soil surveys
- Boundaries of existing
predominant vegetation and proposed limits of clearing
- Location and boundaries
of resource protection areas such as wetlands, lakes, ponds, and other
setbacks (e.g., stream buffers, drinking water well setbacks, septic setbacks)
- Location of existing
and proposed roads, buildings, and other structures
- Existing and proposed
utilities (e.g., water, sewer, gas, electric) and easements
- Location of existing
and proposed conveyance systems such as grass channels, swales, and storm
drains
- Flow paths
- Location of floodplain/floodway
limits and relationship of site to upstream and downstream properties
and drainages
- Preliminary location
and dimensions of proposed channel modifications, such as bridge or culvert
crossings
- Preliminary location,
size, and limits of disturbance of proposed stormwater treatment practices
- Hydrologic and hydraulic
analysis including:
- Existing condition
analysis for runoff rates, volumes, and velocities presented showing methodologies
used and supporting calculations
- Proposed condition
analysis for runoff rates, volumes, and velocities showing the methodologies
used and supporting calculations
- Preliminary analysis
of potential downstream impact/effects of project, where necessary
- Preliminary selection
and rationale for structural stormwater management practices
- Preliminary sizing
calculations for stormwater treatment practices including contributing
drainage area, storage, and outlet configuration
- Preliminary landscaping
plans for stormwater treatment practices and any site reforestation or revegetation
- Preliminary erosion and
sediment control plan that at a minimum meets the requirements outlined in
local Erosion and Sediment Control guidelines
- Identification of preliminary
waiver requests